Tiburon, CA

Project Summary: This is a complete deconstruction.  The main house was originally built in 1961, but has had a more recent update.  In its current configuration, it has 5 bedrooms and 5 bathrooms.  In addition, there are a number out buildings that will be coming down too.
Location: Tiburon, CA
Fixtures: 

framing lumber
redwood decking
cabinetry
windows
lighting
plumbing fixtures
interior and exterior doors
loose slate and concrete pavers
pool equipment

::Login::  ::Logout:: ©2012-2014 The ReUse People of America. All Rights Reserved.